Daunia Mine Coal Handling and Preparation Plant (CHPP) Installation

Sedgman Limited and BHP Billiton Mitsubishi Alliance (BMA)

Moranbah, Queensland, Australia

G&S undertook the structural, mechanical, piping and electrical instrumentation (SMP&EI) installation of the Daunia Mine Coal Handling and Preparation Plant (CHPP).

Works included:

  • ROM bin including feeder breaker
  • Raw coal sizing station including secondary sizer, roller screen and tertiary sizer
  • Two product processing system (spirals and microcel flotation)
  • Rejects disposal system including coarse rejects bin and separate rejects belt press filter building
  • Two thickeners – welded type
  • Two radial stackers
  • Coal valves product reclaim via four coal valves
  • High voltage installation, and
  • Electrical and instrumentation installation.

Our team supplied all construction equipment, cranage, supervision and labour required for the project including commissioning support labour spanning pre-commissioning through to wet commissioning and handover.

All plant was delivered on time, without any injuries and with a peak workforce of over 170 people. Extension contracts were awarded for HV installation.