BHPB Iron Ore Whaleback I/O Replacement

BHP Billiton

Mount Whaleback, Newman, Western Australia, Australia

The existing Beneficiation and OHP2 High Grade Plant PLC systems were installed in 1997/98. However, technology systems age over time and can become unsupported by vendors. It is therefore necessary to upgrade the systems in order to ensure they function as intended and do not fail and cause losses to production.

One of the great challenges of upgrading production systems is that, because they form the central control of production, any changes require the operations to be shut-down. Thus, it is critical to do any upgrades as quickly and as accurately as possible to minimise any production loss.

Our role for these works was to change out the input/output racks for the control system. These racks provide the point where the physical equipment and instrumentation are wired back to the control system to enable the process conditions to be read and the plant devices to be controlled.

Business:

Technologies

Contact

John Van Rensburg

Automation Manager – Technologies Division

61 419 005 363
Email me

Contact us
Discover More Projects